UNSPSC 26131801: Electrical control panels for generators — Commodity Classification
Hierarchy
Related procurement and industry references
UNSPSC often sits beside industry, occupation, and federal procurement classifications rather than replacing them.
Suggested PSC codes
Suggested NAICS industries
Who is this code for
Occupations and roles commonly associated with this classification
Also relevant for
Source: O*NET / BLS occupation data · O*NET 30.2 / BLS SOC
Frequently asked questions
- What is NAICS 26131801?
- NAICS 26131801 is the North American Industry Classification System code for Electrical control panels for generators. It classifies this business activity for statistical, regulatory, and government procurement purposes. Federal agencies use NAICS codes to collect and publish data about the US economy, determine SBA size standards, and set aside contracts for small businesses.
- What licenses and permits does a Electrical control panels for generators need?
- A Electrical control panels for generators typically needs a local business license, a federal EIN from the IRS, and industry-specific permits depending on the sector. Check with your city or county clerk for a general business license, your state's professional or industry licensing board for any required occupational licenses, and your state's tax authority for a sales tax permit if you sell taxable goods or services.
- How do I register a Electrical control panels for generators business in the United States?
- To register a Electrical control panels for generators business, first choose your legal structure: sole proprietorship (simplest, uses SSN), LLC (personal liability protection, files with your Secretary of State), or corporation (Form 1120 or 1120-S). Register your business name (DBA) with your county if operating under a trade name. Obtain an EIN from the IRS at irs.gov/ein. Register with your state revenue department for any applicable taxes.
- What tax forms does a Electrical control panels for generators file with the IRS?
- Tax forms depend on your entity type. A sole proprietor files Schedule C with Form 1040 and Schedule SE for self-employment tax (15.3%). An LLC taxed as a partnership files Form 1065 with Schedule K-1s. A C-Corporation files Form 1120 (21% flat rate). An S-Corporation files Form 1120-S. All businesses paying employees file Form 940 (FUTA) annually and Form 941 quarterly. Estimated tax payments are made via Form 1040-ES four times per year.
- Is Electrical control panels for generators the right NAICS code for my business?
- Your NAICS code should reflect your primary business activity — the one generating the most revenue or value. If Electrical control panels for generators describes your main line of business, NAICS 26131801 is likely correct. If you have multiple distinct activities, you may need separate codes for statistical reporting. For federal contracting, your SAM.gov registration should use the code that best matches the work you perform. Review the official NAICS 26131801 description and exclusions to confirm it fits your operations.
- Does a Electrical control panels for generators need a contractor license in multiple states?
- Contractor licenses are state-specific with limited reciprocity. Many states have partial reciprocity agreements recognizing the exam portion of the license from another state, but you'll still need to apply, pay fees, and may need to pass the state-specific business/law portion. Some states (notably California, Florida, and Arizona) have strict licensing requirements with no reciprocity. Always check the target state's contractor licensing board before performing work across state lines.
- What are prevailing wage (Davis-Bacon) requirements for a Electrical control panels for generators?
- The Davis-Bacon Act requires payment of locally prevailing wages and fringe benefits on federal construction contracts exceeding $2,000. Similar state-level prevailing wage laws (Little Davis-Bacon) apply to state-funded projects in about 32 states. Contractors must submit certified payroll reports (Form WH-347) weekly listing each worker's classification, hours, rate, and fringe benefits. Willful violations can result in debarment from federal contracts for up to 3 years.
- What contractor license does a Electrical control panels for generators need?
- Most states require a general contractor license for projects above a dollar threshold (typically $500-$50,000 depending on the state). Requirements include passing a trade and business/law exam, documenting 2-5 years of experience, providing a surety bond ($5,000-$100,000+), and carrying general liability insurance. Electrical, plumbing, and HVAC require separate specialty licenses in virtually all states with additional trade-specific exams.
- Does a Electrical control panels for generators need workers' compensation insurance?
- Workers' compensation is required in nearly every state for businesses with employees. Exceptions exist for sole proprietors and partners (who can opt-out in most states but should consider coverage) and very small employers in some states. Texas is the only state where workers' comp is entirely voluntary. Construction businesses often face higher rates due to risk classification. Failure to carry required coverage can result in fines, stop-work orders, and personal liability for workplace injuries.
How to use UNSPSC 26131801
Confirm Electrical control panels for generators (26131801) matches your product or service.
Find corresponding PSC or NAICS codes for federal purchasing.
UNSPSC codes are supported by major procurement platforms and ERP systems.
UNSPSC is global — verify country-specific customs or tariff codes separately.
Who uses this code?
Provides interior and exterior painting services for residential repaints and new commercial construction.
- ●State painting/home improvement license
- ●Lead-safe certification (EPA RRP)
- ●Liability insurance
- ●Schedule C (Form 1040)
- ●Schedule SE (Form 1040)
Offers minor home repairs, maintenance, and small improvement projects under state dollar-limit thresholds.
- ●Home improvement license (if over state minimum)
- ●General liability insurance
- ●Schedule C (Form 1040)
- ●Schedule SE (Form 1040)
Manages residential and commercial construction projects from foundation to finish, coordinating subcontractors.
- ●State GC license (exam + bond)
- ●General liability insurance
- ●Workers' comp
- ●Form 1065 or 1120-S
- ●Form 1099-NEC (subs)
- ●Form 940 (FUTA)
- ●Form 941
Installs, maintains, and repairs electrical systems in residential, commercial, and industrial settings.
- ●State electrical license
- ●City/county permit pull authorization
- ●Liability insurance
- ●Schedule C (Form 1040)
- ●Schedule SE (Form 1040)